亚洲成人精品在线免费,日本一区二区不卡网站,精品69视频一区二区三区网站,性色α√人人爽人澡人人妻蜜臀

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

steel mill cylinder Sold to Estonia

Release time:2023-12-09 16:24:19 Hits: Current position: Home > News

This article mainly introduces:

Estonia hydraulic cylinder,steel mill cylinder manufacturer,steel mill cylinder

Estonia steel mill cylinder

(Estonia steel mill cylinder,produced by Hengyu Hydraulic Co., Ltd)

steel mill cylinder are widely used in Estonia,because of high work efficiency,excellent fatigue and impact resistance,no need for deceleration device.So our company has designed steel mill cylinder for customers from Estonia.

Introduction to steel mill cylinder:

steel mill cylinder piston rod material selection and technical requirements: (I), because there is no special requirements, so use 45 steel as the piston rod material, the design of the piston rod only withstand pressure stress, so no modulation processing; (ii) The coaxial tolerance of the shaft journal and the outer circle of the mounting piston is not greater than 0.01mm, so as to ensure the coaxial degree of the outer circle of the piston rod and the outer circle of the piston, and avoid the stuck phenomenon of the piston and the steel mill cylinder, the piston rod and the guide. The vertical tolerance between the end face of the mounting piston and the axis of the piston rod is not more than 0.04mm/100mm to ensure that the piston installation does not produce skew; (iii) The outer circle of the piston rod should pay attention to the roughness; (iv) Because it is operated under low load conditions, surface treatment is omitted.

Before the steel mill cylinder is removed, the relief valve should be loosened to reduce the pressure of the hydraulic circuit to zero, and then the power supply should be cut off to stop the hydraulic device. After loosening the oil port piping, the oil plug should be applied to plug the oil port.

1, the hydraulic machinery should be kept clean, in order to prevent dust and debris from falling into the oil, the tank should be sealed. 2, the oil in the tank should be replaced regularly according to the working condition. When changing the oil, the dirt and impurities accumulated at the bottom of the tank should be removed and the tank should be cleaned. 3, hydraulic oil, oil drums should be set in a clean and safe place to strengthen management. The oil drum, oil filter, oil funnel, oil pipe, etc. used should be kept clean. The oil drums for loading hydraulic oil must be cleaned in advance, and the oil drums should be dedicated and not mixed with other oil drums.

Do not regularly check the damage of the chrome layer of the steel mill cylinder: completely extend the steel mill cylinder and carefully check whether there is any surface damage such as injury, strain, welding slag, such as the surface damage position, in the steel mill cylinder block < 20cm, and the damage depth < 5mm, should be repaired in time to prevent long-term damage to the steel mill cylinder seal. Welding slag is strictly prohibited on the surface of the steel mill cylinder.

Answers to some questions about steel mill cylinder:

Two cylinders have a reversing control, if the load of the two cylinders is not the same, how to ensure their synchronization?
The piston rod of the cylinder is required to extend synchronization: install A shunt collector valve or synchronous motor at port A of the direction control valve, and then connect the two outlets of the shunt collector valve to the rod-free cavity of the two cylinders respectively. It is required that the outlet of the diverter collector valve is connected to the rod cavity of the two cylinders respectively when the piston rod is withdrawn in synchronization. The synchronization performance depends on the quality of the diverter valve and the leakage of the hydraulic system.

Why the injection cylinder retreating after the injection molding machine is started?
It is likely that the projected area of the molded plastic parts is large or the injection pressure set is relatively large, resulting in the expansion force exceeding the clamping force of the injection molding machine, so the mold is backward. You can do the following attempts: 1, reduce the injection force of the injection molding machine; 2, if the injection molding part can not be well formed by reducing the injection force, it is recommended to install the mold to a larger injection molding machine.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
欧美一级黄片在线播放| 国产精品欧美大片在线观看| 日韩欧美精品中文字幕一区| 亚洲国产精品成人一区二区三区| 亚洲欧美一区二区久久| 久久综合视频三级黄片| 人与嘼一区二区三区| 欧美日韩在线看免费看成人| 国产av一区二区三区久久久久| 国产日韩欧美精品小视频| 97在线视频播放免费观看不卡| 色欲香天天综合免费区一区二| 麻豆理论片在线观看| 亚洲欧洲一区二区三区av| 亚洲国产精品尤物yw在线| 日韩推理片电影在线播放| 亚洲线日本一区二区三区| 亚洲91精品视频在线观看| 亚洲精品夜夜夜妓女网| 免费看中文字幕一级高清| 久久久久久精品无码免费看| 国产一级二级三级在线观看| 欧美一级精品片在线看| 精品日韩欧美一区在线播放| 欧美高清手机一区二区| 国产精品热门在线播放| 亚洲国产精品91网| 欧美国产日韩在线播放| 国产人成尤物在线免费观看| 国产微拍无码精品一区| 亚洲国产电影一区二区三区| 黄色网色网色网色网色网站| 国产精品亚洲一区二区三区欲| 93国产精品久久久久久| 国产欧美精品区一区二区三区竹菊| 欧美亚洲综合中文字幕蜜桃成熟| 国产一级二级三级精品| 日本一区二区三区中文字幕八戒视频| 久久久久久国产综合精品| 日本精品va在线观看| 久久久久久亚洲一区二区|