亚洲成人精品在线免费,日本一区二区不卡网站,精品69视频一区二区三区网站,性色α√人人爽人澡人人妻蜜臀

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

large hydraulic cylinder Sold to Morocco

Release time:2023-11-12 15:29:59 Hits: Current position: Home > News

This article mainly introduces:

Morocco hydraulic cylinder,large hydraulic cylinder manufacturer,large hydraulic cylinder

Morocco large hydraulic cylinder

(Morocco large hydraulic cylinder,produced by Hengyu Group)

large hydraulic cylinder are widely used in Morocco,because of simple structure and reliable operation,excellent temperature resistance,no transmission clearance.So our company has designed large hydraulic cylinder for customers from Morocco.

Introduction to large hydraulic cylinder:

Causes and countermeasures of oil large hydraulic cylinder leakage: Cast iron ring seal allows a certain degree of internal leakage. The impurities in the large hydraulic cylinder will lead to premature wear of the piston seal, replace the piston seal; If the large hydraulic cylinder is visibly scarred, the large hydraulic cylinder must be replaced. It can be pressurized at one end of the large hydraulic cylinder and opened at the other end of the oil port to observe whether there is obvious internal leakage at the end of the oil port. Most large hydraulic cylinder piston drift may not come from the large hydraulic cylinder, the above method to determine the large hydraulic cylinder without internal leakage is helpful to determine the problem of the hydraulic system related components.

In order to ensure the service life of the large hydraulic cylinder, the medium used must not be mixed with impurities and stolen goods, so as to avoid scratching the inner arm of the large hydraulic cylinder, causing damage to the seal and causing leakage in the large hydraulic cylinder. It is required that the filtration accuracy of the system is not less than 80μm, the oil pollution is strictly controlled, the hydraulic oil is kept clean, the performance of the hydraulic oil is regularly checked, and the necessary fine filtration or replacement of the new working hydraulic oil is carried out.

What kind of process is used in the large hydraulic cylinder to make high-quality large hydraulic cylinder products: the body is the main component of the large hydraulic cylinder, mining single pillar, hydraulic support, gun tube and other products, and its processing quality directly affects the life and reliability of the entire product. Body processing requirements are high, the internal surface roughness requirements are Ra0.4 ~ 0.8&um, the coaxiality, wear resistance requirements are strict. The basic feature of body is deep hole processing, which has always troubled the processing personnel. The large hydraulic cylinder products of our company mainly use rolling processing, because the surface layer has surface residual compressive stress, which helps to close the surface micro-cracks and hinder the expansion of erosion. Thus, the corrosion resistance of the surface can be improved, and the fatigue crack can be delayed or expanded, and the fatigue strength of the body can be improved. The correct rolling process of the large hydraulic cylinder block: broaching block - fine boring block - grinding block. The rolling method is: broaching block - fine boring block - rolling block, the process is 3 parts, but the time is compared: grinding 1 meter of the block is about 1-2 days, rolling 1 meter of the block is about 10-30 minutes. Input comparison: grinding machine or quilting machine (tens of thousands - millions), rolling knife (ten thousand - tens of thousands). After rolling, the surface roughness of the hole decreases from RA3.2-6.3um before rolling to RA0.4-0.8&um, the surface hardness of the hole increases by about 30%, and the fatigue strength of the inner surface of the large hydraulic cylinder increases by 25%. If the service life of the large hydraulic cylinder is only considered, it is increased by 2 to 3 times, and the efficiency of the boring and rolling process is about 3 times higher than that of the grinding process. large hydraulic cylinder misoperation or operation failure may be caused by the following reasons, you can start from these aspects of the investigation: (1) spool stuck or valve hole blocked. When the spool of the flow valve or direction valve is stuck or the valve hole is blocked, the large hydraulic cylinder is prone to misoperation or operation failure. At this time, the contamination of the oil should be checked; Check whether dirt or colloidal deposits are stuck in the spool or blocking the valve hole; Check the wear of the valve body, clean and replace the system filter, clean the fuel tank, and replace the hydraulic medium. (2) The piston rod and large hydraulic cylinder are stuck or the large hydraulic cylinder is blocked. At this time, no matter how to manipulate, the large hydraulic cylinder does not move or moves very little. At this time, check whether the piston and piston rod seal is too tight, whether it enters the dirt and gum deposits: whether the shaft line of the piston rod and the large hydraulic cylinder is in the center, whether the wearing parts and seals are invalid, and whether the load is too large.

When the large hydraulic cylinder needs to be stored for a period of time, please follow the recommended methods: The large hydraulic cylinder should be stored in a dry, clean, non-corrosive gas indoor environment, pay attention to protect the large hydraulic cylinder from internal corrosion and external damage. If the indoor requirements cannot be met, the hardened and well-drained ground should be cushioned at least 30cm, and the upper part should be covered with waterproof storage. The oil large hydraulic cylinder should not be in direct contact with water vapor for a long time. The large hydraulic cylinder should be placed as vertically as possible with the piston rod facing up, which minimizes corrosion due to possible condensation in the large hydraulic cylinder and permanent deformation of the seal due to the piston and rod weight. (When the shield is stored in the shield machine, the support shoe is placed upward). Keep the oil port protective cover until the pipe is connected. For long-term storage, the protection should be added on both sides of the piston of the large hydraulic cylinder Before working, the large hydraulic cylinder must be run repeatedly with low pressure (greater than the starting pressure) to discharge the air in the large hydraulic cylinder before normal work. The oil inlet and outlet and the joint must be tightly fastened with a combination pad to prevent oil leakage.

Answers to some questions about large hydraulic cylinder:

Cylinder pressure calculation formula
The pressure of the cylinder at work is determined by the load, and the pressure of the physical force is equal to the force divided by the area of action (that is, P=F/S). If you want to calculate the output force of the cylinder, you can calculate it according to the formula: Set the radius of the piston (that is, the cylinder) is R (unit mm) the radius of the piston rod is r (unit mm) the working pressure P (unit MPa) the thrust of the cylinder F push =3.14*R*R*P (unit N) The pulling force of the cylinder F pull =3.14* (R*R-r* R) *P (unit N).

What is the reason for the hydraulic cylinder sticking out and not retracting?
There are two reasons: First, the problem with the seal, if there are two seals on the piston, the top seal is broken. Second, when the hydraulic pressure itself is designed, the rod cavity area is too small, so that the desired return force can not be achieved during the return trip. You can first check whether the coupling is damaged; Then see if the relief valve in the oil line block is blocked. If the use time is too long, it needs to be cleaned, the hydraulic oil is very dirty and can block oil block. Electromagnetic directional valves can also be checked, but the chance of problems is relatively small, unless there is a product problem.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
使劲操大骚逼av| 精品一区二区三区女性色| 日韩一区二区三区夜色视频| 成人高清在线播放一区二区三区| 欧美人与动人物A级| 国产妇女乱一性一交| 久久久久人妻一区精品加勒比| 让女人下面出水视频| 男人吃奶大鸡巴操逼视频| 胸大裸体美女视频| 久久综合日韩亚洲精品色| 把女生操出水的视频| 亚洲精品美女久久久| 好想大鸡巴插进阴道视频| 欧美老熟妇又粗又大| 美女的咪咪和骚逼| 国产成人无码AV一区二区三区| 日本一区二区三区四区五| AV天堂手机福利网| 国产欧美一二区不卡视频| 精品人妻一区二区三区日产乱码| 黑人大吊性交啪啪啪| 国产精品毛片一区视频播| 在线 中文字幕 第一页| 美女被插b在线观看| 国产精品999午夜激情| 成人免费a级毛片天天看| 色熟妇人妻久久中文字幕| 日本不卡高清视频在线播放| 大鸡巴抽插小穴色虐视频| 亚洲精品一区二区精华液| 被公侵犯人妻少妇一区二区三区| 精品无码国产一区二区三区A| 国产高清乱码女大生AV| 久久久中文字幕在线视频| 欧美丰满大屁股女人的逼被操视频| 啊啊啊好疼视频进来| 亚洲二亚洲欧美一区vr| 深插巴西美女的逼| 日本一区二区不卡在线国产| 日韩午夜资源在线观看|